NW 17 Street Roadway Improvements
Two Roadway Improvements in the Grapeland Neighborhood on NW 17 Street in City of Miami, District 1
- Project I – From NW 32nd to NW 37 Avenue (40-B183611A)
- Project II – From NW 27 to NW 32nd Avenue (40-B183611)
The City of Miami and City District 1 Commissioner Miguel Angel Gabela proudly announce the design and construction of a roadway improvements project in the Grapeland Neighborhood in District 1.
This City Roadway improvement project has a Joint Partnership Agreement (JPA) component with Miami Dade County Water and Sewer (MD-WASD) to upgrade the existing water main line and water services.
Project is currently in the design phase.
Elements of the Project:
- Full road reconstruction to include milling and resurfacing
- New sidewalks and ADA pedestrian ramps
- Driveway approaches, curb and gutter
- Landscape work, pavement markings and signage
Benefits of the Project:
- Improve pedestrian walkability (New sidewalks, new pedestrian ramps and crosswalks.)
- Improve vehicular traffic (New asphalt pavement, pavement markings and signage. Implementation of curb and gutter along with 30’ turning radius and reduced traffic lanes width (11’) to discourage speeding.)
- Stormwater drainage improvements (Existing stormwater drainage system is being upgraded to meet RPW current Engineering Standards)
- Proposed street cross section provides on-street parking, which has been identified as a need for most of the residents in the area, while preserving landscaped swales.
- The new design will accommodate swale areas (and tree planters along the parking lanes where feasible) allowing new tree planting (under a separate project) which provides shade for pedestrians, beautifies the area, and acts as a traffic calming element within the proposed street cross section. This benefit is pending internal Resilience and Public Works (RPW-ER) coordination, contingent to funds availability.
- The JPA with MD-WASD to upgrade the existing water main line and water service lines should provide general improvements to the water service in this area.
Project Boundaries (Refer to Map Below)
- Project I – From NW 32nd to NW 37 Avenue (40-B183611A) – Anticipated construction to start in February 2025.
- Project II – From NW 27 to NW 32nd Avenue 940-B183611) – Anticipated construction to start in October 2025.
Provide your feedback about this project here