S. Bayshore Ln. & Fairview St. Roadway Improvements & New Pump Station
Project Number: 40-B30737
Click the tab below to view the South Bay Shore Lane Pump Station (Phase II) Presentation, shared at the May 16th, 2024 community meeting.
South Bayshore Lane Pumpstation - May 16th, 2024, Community Presentation
Phase I - Completed in December 2020!
Phase I of this project included roadway and drainage Improvements on South Bayshore Lane and East/West Fairview Street. The scope of work included the following:
- Roadway reconstruction
- Drainage improvements, including a new watermain line replacement (done jointly with the Miami-Dade Water and Sewer Department)
- Damaged sidewalk replacement
- Repair of driveway approaches
- Swale restoration
- Pavement marking, signage and ADA ramps
Phase II - Project Scope:
Design and construction of new stormwater pump station with a raised platform, two gravity drainage wells, a SCADA system, and upgrade to an existing outfall.
Project Cost Estimate:
$12,416,698
Project Benefits and Impacts:
The project will help alleviate localized flooding experienced by the community.
- Number of properties impacted: Total = 96 (92 Residential and 4 Non-Residential)
- Total property value protected: $118M
Pump Station Location & Rendering:
Estimated Construction Timeline:
- Estimated Construction Start: Winter 2025
- Estimated Construction End: Winter 2027