Woodside Park

Forever-Bond-Logo-002.png
Groundbreaking Ceremony to take place on November 7, 2024 at 2:30pm – You are Invited!

Woodside Park Groundbreaking Ceremony Flyer English  Woodside Park Groundbreaking Ceremony Flyer Spanish

A New Park in the Neighborhood in District 3 - Un Nuevo Parque en el Distrito 3!
  • Construction of a new park will begin soon - Construcción comenzará pronto
  • Green space access is closed now - El acceso al área verde permanecerá cerrado hasta terminar la construcción
  • Construction status to be posted once construction begins - Les mantendremos informados sobre el avanze de la construcción

Design Plans for the New Park: The image below shows the different elements that will be part of the new park.  It depicts an open lawn area, a playground, a dog park for small dogs (under 15 pounds) and another dog park for larger dogs. It also shows the location of several large and beautiful trees that were kept from the original properties. 

Park Elements:
  • Playground areas for children (2-5 years old and children 5-12 years old).
  • Bicycle racks, outdoor exercise equipment, open green space, benches and walkway paths around landscaped green areas.
  • Plenty of trees for shade and comfort and 2 covered shelter areas.
  • Two (2) separate dog areas for dogs 35lbs and under, and over 35lbs.
  • Roadway Improvements around the park.
  • New concrete wall perimeter fence.       
  • Two (2) new pickleball courts. (Phase II of the project)      
  • Brand new community center. (Phase II of the project)

Plan de Diseño del Nuevo Parque: La imagen de abajo muestra los elementos que serán parte del nuevo miniparque.  Muestra un área verde, un área de      juego para niños, áreapara perros pequenos (abajo de 15 lbs.) y otra área para perros más grandes.  Muestra también la ubicación de muchos frondosos y lindos árboles que fueron preservados de las propiedades anteriores.  

Elementos del parque:
  • Zonas de juegos para niños (De 2 a 5 años y de 5 a 12 años).
  • Aparcabicicletas, equipo de ejercicio de doble uso, espacios verdes abiertos, bancos y senderos alrededor de zonas verdes con jardines.
  • Varios árboles para brindar agradable sombra, y 2 zonas de refugio cubiertas.
  • Dos (2) áreas para perros separadas: Una para perros de hasta 35 lbs, y otra para perros de más de 35 lbs.
  • Mejoras en la calzada alrededor del parque.
  • Nueva cerca de concreto alrededor del perímetro del parque. (Fase 2 del proyecto)
  • Dos (2) canchas de pickleball nuevas.Nuevo centro comunitario.(Fase 2 del proyecto)

 

Woodside Mini Park Plans Drawing, Phases 1, 1A and 2

Proposed Parking Locations/ Ubicaciones de estacionamiento propuestas 

The image below depicts seven (7) parking spaces (six regular spots, and one ADA) for the new park, located on SW 1st Avenue.                                                         

La siguiente imagen muestra siete (7) espacios de estacionamiento (seis espacios regulares y uno ADA) para el nuevo parque, ubicado en SW 1st Avenue.Image of new parking spaces at Woodside Mini Park

About the Project

The City of Miami, D3 Commissioner Joe Carollo, the Department of Parks & Recreation and the Office of Capital Improvements (OCI) proudly announce the groundbreaking ceremony of phase I of the new Mini Park in District 3, the Woodside Mini Park.  An additional lot (SW 3691) was secured in the neighborhood to increase the new mini park area, this will be phase II. The demolition of the existing property at 3691 will take place after the groundbreaking ceremony.

The new park elements will include:

Phase I & Phase IA
  • Playground areas for children (2-5 years old and children 5-12 years old)
  • Bicycle racks, dual use exercise equipment, open green space, benches and walkway paths around landscaped green areas
  • Plenty of trees for shade and comfort and a covered shelter area
  • Two (2) separate dog areas for dogs 35lbs and under, and over 35lbs.
  • Roadway Improvements around the park
  • New perimeter fence

Phase II on Newly Acquired lot, increasing the park size
  • New community building
  • New pickleball courts 

Provide your feedback about this project here

Los elementos del nuevo parque incluirán:

Fase I y Fase IA
  • Área de juegos (dividida para niños de 2-5 años de edad y 5-12 años de edad)
  • Estacionamiento y sendero para bicicletas (6 pies de ancho), bancas y caminos alrededor de áreas verdes con pasisajisom
  • Abundantes árboles para dar sombra y comodidad
  • Mejoras viales alrededor del parque
  • Nueva valla
    
Fase II
  • Nueva construcción comunitaria
  • Nuevas canchas de pickleball

 

 Deja tus comentarios sobre este proyecto aquí

Community Meeting

Final Community Meeting Held on Wednesday, September 29th, 2021

Residents under a tent in an open field for the 3699/3701 SW 1 Avenue Mini Park Final Community Meeting

2 Residents with a dog near a large tree at the site of the future 3699/3701 SW 1st Avenue Mini Park

The Office of Capital Improvements Guest check-in table at the 3699/3701 New Mini Park Final Community Meeting 

Existing Park Images

Park Existing Conditions   

 

Existing Conditions Tree Photos



Future Plans

Park Component Photos