The City of Miami, District 5 Commissioner Christine King, the Department of Parks and Recreation,
and the Office of Capital Improvements proudly announce the reconstruction of the Legion Park Community Center and other improvements that are part of this project!  

Legion Park Location: 6447 NE 7th Avenue, Miami, FL 33138

Community Building Refurbishing Project and Basketball Courts are Complete! Stay tuned for a ribbon cutting celebration with the community very soon!

Legion Park New, Colorful, Basketball Courts     New, colorful, basketball courts at Legion Park 2

Renovated Interior Hallway at Legion Park    Renovated Interior Room at Legion Park 2

Renovated Interior Room at Legion Park 1

Legion Park Parking Lot Refurbishing Project is Complete!
Parking Lot to Open on Friday, October 25, 2024!

Photo of the newly renovated Legion Park Parking Lot  Photo of the newly renovated Legion Park Parking Lot

Project Included:
  • Pavement restoration
  • Repainting of pavement markings 

The parking lot before renovations:

Legion Park Parking Lot Photo Before Renovation

A Community Meeting was held to present the status of three City Projects at Legion Park on September 19, 2024, at 6:00pm, at Morningside Park (750 NE 55th Terrace, Miami, FL 33137). Construction statuses were shared with residents through photos, as well as the proposed design for a new walkway (from the parking lot to the seashore) and a new park gateway on NE 67th Street   

OCI Construction Status - July to October 2024

  • Mechanical rough installation is completed
  • Electrical & plumbing rough completed
  • Dry wall installation completed
  • Roofing completed
  • Elevator installation completed
  • Installation of tiles in bathrooms completed
  • Installation of terrazzo flooring completed
  • New four air conditioning units (HVAC) 1, 2, 3 & 4 installation completed in August 2024
  • Wooden floors and ceiling tiles installation completed in August 2024
  • New glass doors and 4-foot wall - completed 

  • Next Action: Waiting for sensor replacements, A/C units and elevator. The building is anticipated to be completed by the end of November 2024
     

Replacement of old glass doors with a 4-foot wall to an open area, by entry - Completed in October 2024!

Photos of replaced windows in the Legion Park Community Building   Photos of replaced windows in the Legion Park Community Building

Photos of construction progression:

Clubroom - 2nd Floor Ceiling and Flooring:

 Legion park community building, ceiling completed.JPG   Legion Park community building, work in progress on the floor.JPG

Meeting Room - 1st Floor: 

Legion Park Community Building, work in progress.JPG

New Roof Installation - Completed! 

Newly Installed Shingle Roof on Legion Park Community Center 1     Newly Installed Shingle Roof on Legion Park Community Center 3

Interior Areas and Old Roofing - Initial work in progress:      

The front of the Legion Park Community Building          

New and improved elements in the building will include:

  • Re-roofing of existing shingle roof (possibility of a clay barrel tile roof is being evaluated)
  • Upgrade/remodel of bathrooms
  • New warming kitchen
  • Terrace repairs and new landscaping
  • New elevator and fire alarm system
  • New acoustical ceilings, interior layout modifications and replacement of selected doors and windows
  • Second floor finishes and cabinetry
  • Miscellaneous repairs of exterior walls
  • Milling and resurfacing of existing parking lot and sidewalks repairs
  • New tennis court and resurfacing of existing tennis court

While the building is in construction, a rental trailer will be available on-site to maintain the park’s programming for school children.

 
First Floor Design Plan and Materials (click here(PDF, 11MB) to download the PDF version of the image below)

CM-Legion-Park_Board-1.jpg

 

Second Floor Design Plan (click here(PDF, 7MB) to download the PDF version of the image below)

CM-Legion-Park_Board-2.jpg

 

Restroom Materials Details

Legion-Park-Restroom-Materials.jpg

Exterior Community Terrace
Legion-Park-RENDERING-2.jpg

Side view of the Community Center
Legion-Park-RENDERING-1.jpg


Click here(PDF, 1MB) to download the Legion Park Community Building Exterior Elevations document
Legion-Park-Building-ELEVATIONS_1.jpg

Click here(PDF, 1MB) to download the Legion Park Community Building Site Plan document
Legion-Park-Community-Building-SITE-PLAN.jpg

 

Provide your feedback about this project here