South West Wynwood Neighborhood Flood Improvements
Project Number: 40-B233814
Project Scope:
Design and construction of stormwater infrastructure and associated roadway improvements including force mains, injection wells, pump station, new and upsized stormwater inlets and pipes, gravity wells, exfiltration trenches, roadway reconstruction, milling and resurfacing, curbs and gutters, ADA ramps, and signage and pavement markings. This project may also include a requested Joint Participation Agreement (JPA) with the Miami-Dade Water and Sewer Department (MDWASD) for installing an 8-inch water main, water services, and fire hydrants.
Project Cost Estimate:
$31,698,773
Project Benefits and Impacts:
The project will help alleviate localized flooding experienced by the community.
- Number of properties impacted: Total = 861 (618 Residential and 243 Non-Residential)
- Total property value protected: $1B
Project Boundaries:
The project limits are bounded by NW 28 Street on the North, NW 16 Street to the South, NW 5 Place to the West, and NW 1 Court to the East. The stormwater pump station location is anticipated in the vicinity of NW 17 Street.
Road Closures:
Some road closures may occur during construction but will be sequenced appropriately to minimize disruption to the residents.
Estimated Construction Timeline:
- Estimated Construction Start: Winter 2027
- Estimated Construction End: Fall 2029