Traffic Calming Devices NW 15 Ave between NW 7 Street and NW 9 Street
Project Number: 40-B243607
Project Scope:
Assessment of two locations for geometric fit for traffic calming device installations; balloting of one acceptable location; design and construction of one raised intersection at the eligible location.
Project Cost Estimate:
$871,638
Project Benefits and Impacts:
- Number of properties impacted: Total = 4 Residential
- Total property value protected: $2M
Project Boundaries:
The project limits are bounded by
Location 1: NW 15 Ave and NW 8 Ter - Raised intersection (by City) and All-Way Stop Condition by MDC-DTPW.
Location 2: NW 15 Ave between NW 7 St and NW 8 St – Removed from project.

Road Closures:
Some road closures may occur during construction but will be sequenced appropriately to minimize disruption to the residents.
Estimated Construction Timeline:
- Estimated Construction Start: Fall 2026
- Estimated Construction End: Summer 2027