SW 15 Road from SW 3 Avenue and SW 11 Street

Project Number: 40-B173619

Project Scope:

Traffic study, design and construction of traffic calming, pedestrian safety, roadway and stormwater infrastructure improvements including roadway reconstruction, curbs and gutters, ADA ramps, drainage system, signage and pavement markings, lighting and landscaping.

Project Cost Estimate:

$6,487,465

Project Benefits and Impacts:

  • Number of properties impacted: Total = 6 (3 Residential and 3 Non-Residential)
  •  Total property value protected: $8M

Project Boundaries:

The project limits are bounded by SW 15 Road from SW 3 Avenue to SW 11 Street.

Map indicating 40-B173619 Project Boundaries.png

Road Closures:

Some road closures may occur during construction but will be sequenced appropriately to minimize disruption to the residents.

Estimated Construction Timeline:

  • Estimated Construction Start: Winter 2027
  • Estimated Construction End: Spring 2028

Provide your feedback about this project here